First track maintenance services at the Krumpe

On 29th and 30th of March 2019, the first track maintenance rides have been performed between Ober-Grafendorf and Rammersdorf. Woodcut was collected along the rails and taken to a collection point, on order to dispose it by road transport.

[Best_Wordpress_Gallery id=”4″ gal_title=”20190401 Krumpe Bauzug”]

Further impressions can be found in the linked gallery.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.